I was hoping to get moved into the north bedroom this weekend but , paint will only dry so fast and there isn't much you can do to speed up the process. As of Labor Day afternoon the ceiling has three coats and is mostly done. the walls have 2 coats and look good I have to go around the edges where the rollers couldn't reach , the interface between the wall and ceiling , and the inside corners the roller couldn't get.
Monday, September 5, 2022
Subscribe to:
Post Comments (Atom)
-
The new basement windows are working well , the subterranean vault is much more cozy and the Grouch Cave less drafty . I'm still workin...
-
I have a couple windows in the basement (Grouch Cave) that are falling apart . Two double hung windows side by side . I like the windows th...
No comments:
Post a Comment